The First 10 Days on a D365 Project: What Separates Strong Consultants From Average Ones

  • 3 minutes ago
  • 4 min read

The first 10 days on a D365 project rarely show up in the SOW, but they set the tone for everything after. Clients don't judge a new consultant by how much Dynamics 365 they know on day one. They judge them by how they show up: whether they ask sharp questions, write things down without being told to, and produce something concrete before anyone has to ask for it.


That gap between reactive and proactive is what separates a strong D365 consultant from an average one, and it's visible within the first two weeks. Here's what those 10 days should actually cover: onboarding, discovery, documentation, stakeholder alignment, and early delivery.




Days 1-2: Onboarding

Average consultants treat onboarding as someone else's job to finish before they can start. Strong consultants use it as their first chance to build credibility.


That means:

  • Chasing environment access, licenses, and security roles on day one instead of waiting for IT to circle back

  • Reading whatever documentation already exists, including outdated versions, since even old process maps and prior discovery notes reveal what the client actually cares about

  • Getting a real org chart or stakeholder list before the first call, so questions in that call are informed instead of generic

  • Comparing the signed SOW against what the client describes as scope, because gaps between the two show up here first, not later

A consultant who spends the first two days waiting to be unblocked is already behind. One who spends it building context is already ahead.



Days 2-5: Discovery

This is where the separation actually starts. Average consultants run discovery as a checklist: confirm the modules in scope, confirm the processes, move to the next session. Strong consultants treat it as an investigation.


A few habits make the difference:

Asking why, not just what. Knowing that a process is done manually is a fact. Knowing why it's still manual, what happens when it isn't followed, and who relies on the workaround is what actually informs a design decision.


Talking to the people doing the work, not only the people managing it. Process owners describe how a process is supposed to work. The people executing it day to day usually describe something a little different, workarounds included. Both versions matter, and the gap between them is often the most useful thing to document.


Surfacing exceptions early. Every process has a standard path and edge cases nobody mentions until testing. Getting those exceptions on the table in week one, instead of discovering them in UAT, is what keeps a timeline intact.


Flagging conflicting information instead of quietly resolving it. If two stakeholders describe a requirement differently, a strong consultant raises it and gets it clarified rather than picking whichever version came first.


Discovery gaps compound. A requirement missed in week one tends to resurface as a change request months later, once it's more expensive to fix.



Days 3-7: Documentation

This overlaps discovery on purpose. Average consultants document after the fact, reconstructing notes from memory once details have already blurred. Strong consultants document as they go.


What that looks like in practice:

  • Meeting notes sent out the same day, with clear action items and owners, not a summary written a week later

  • A requirements log that gets updated live during discovery, not assembled at the end of the phase

  • Rough process maps drafted early, even before they're polished, since a diagram tends to expose gaps a paragraph can hide

  • Open questions tracked in one shared place the client can see, instead of scattered across email threads and chat messages

Documentation isn't overhead work squeezed in around the "real" job. It's what protects both the consultant and the client when scope questions come up later, which they generally do.



Throughout: Stakeholder Alignment

A D365 project rarely fails because the technical design was wrong. It usually fails because the people involved weren't aligned on what "done" meant. Alignment isn't a single kickoff meeting, it's a habit that starts in the first 10 days and continues for the life of the project.


Strong consultants:

  • Identify who actually makes decisions, separate from whoever is easiest to reach

  • Agree on communication cadence and escalation paths before there's a reason to need them

  • Summarize back what they heard after key conversations, so misunderstandings get caught in week one instead of week ten

  • Raise risk plainly and early, instead of letting it wait for the next formal status update

Average consultants wait for problems to surface on their own. Strong ones create the conditions for problems to surface early, while they're still cheap to fix.



Days 8-10: Early Delivery

By the end of the first two weeks, a strong consultant has something tangible to show: a validated process map, a draft fit-gap list, a prioritized set of open decisions the client needs to make. It doesn't need to be finished. It needs to be real.


This matters for two reasons. It gives the client visible proof that discovery is turning into progress, and it forces the consultant to test their own understanding against something concrete, which is usually when the remaining gaps show up.


Consultants who spend two weeks "still getting up to speed" with nothing to point to lose credibility early, even when the work that follows is solid.



What Actually Separates Strong Consultants From Average Ones

Strip away the day-by-day breakdown and the pattern is simple. Strong D365 consultants are proactive instead of reactive. They document as they go instead of reconstructing later. They ask uncomfortable questions early instead of letting them surface in UAT. They manage stakeholders as deliberately as they manage requirements. And they have something to show before anyone has to ask for it.

None of this requires more product knowledge than an average consultant already has. It requires discipline in the first 10 days, because that's when the habits for the rest of the project get set.



Hiring or Placed on a D365 Project?


For businesses: Explore how Live D365 can connect you with experienced Microsoft Dynamics 365 consultants who can add value from day one.




For professionals: Discover contract opportunities and connect with leading organisations through Live D365.


 
 
 

Comments


bottom of page